Instruction
- Preparation:
- Follow manufacturer’s instructions
- Wear required PPE
- Set up in a well-ventilated area (a spray booth)
- Ensure surface protection: cover surrounding areas
- Clean the surface area you plan to bond
- Application:
- Apply a small amount of solvent cement to one surface using the applicator
- Quickly press the two surfaces together and hold for a few seconds
- Curing:
- Let the bond fully cure (up to 24 hours) for maximum strength
Product List
Prohibited
- Plastruct Plastic Weld
- Plastruct Bondene
- 3M Scotch-Weld Acrylic Structural Plastic Adhesive DP 8010 Blue
- Weld-On 3
- Weld-On 4
Allowed
- Testors Liquid Cement for Plastic Models
Required Personal Protective Equipment (PPE)
- Eye Protection: Chemical Splash Goggles or Face Shield
- Skin Protection: Nitrile Gloves
Engineering Controls
- Use in a well-ventilated area (spray booth)
- Use in area where a safety eyewash and shower are nearby (Project Room, Gund L31)
- Use in area where a spill kit is nearby (Project Room, Gund L31)
Emergency Response
- Skin Contact: Wash with soap and water. Seek medical attention if irritation persists
- Eye Contact: Flush with water for 15 minutes. Seek immediate medical attention
- Inhalation: Move to fresh air, and seek medical attention if symptoms occur
- Ingestion: Do not induce vomiting, rinse mouth, seek immediate medical attention
Storage
- Store in a cool, dry place
- Keep the container tightly closed
- Store away from heat, sparks, and open flame, in a yellow Flammables Cabinet
Disposal
- Dispose of hardened cement (no longer liquid) in the landfill waste bin
- Consult Lab staff to determine local hazardous waste disposal requirements for unused product